Tunisia is a market of renovation and infill: small plots between existing buildings, villages inland from Sfax and Sousse, and yards that pour a few hundred cubic metres a week rather than a thousand a day. That pattern rewards a compact machine with a fast turnaround, not a large plant.
Ask on WhatsAppWhen the plot is 12 m wide between two party walls, the pump truck cannot set up and the mixer truck cannot turn. A 2.8 m wide self-loading unit enters, discharges through the chute and leaves without blocking the street.
A ready-mix yard can use it for the small orders that are unprofitable to deliver, and a rental fleet can hire it out by the day with one operator. The same unit covers both, which is why it holds its value in this market.
Rades and Sfax are short calls from China compared with West Africa, so the machine reaches the site quickly after the 15 to 20 working days of production.
| Model | Drum | Practical output / 10 h | Width |
|---|---|---|---|
| LM-S2600 | 2.6 m³ | 80–100 m³ | 2,800 mm |
| LM-S3500 | 3.5 m³ | 110–140 m³ | 2,850 mm |
| LM-A3500 | 3.5 m³ | 110–140 m³ | 2,900 mm |
| LM-S4000 | 4.0 m³ | 120–160 m³ | 2,850 mm |
| LM-A4500 | 4.5 m³ | 150–190 m³ | 2,900 mm |
All figures are practical output over a ten-hour day with local aggregate and one operator, not catalogue maximums.
We ship to Rades, Sfax, Sousse, Bizerte. Every unit leaves Xuzhou in a single 40 foot high-cube container with the cab, hopper and discharge chute dismantled and secured inside, so the machine arrives complete and nothing travels loose.
Production takes 15 to 20 working days after the deposit and the specification are confirmed. Ocean transit is added on top and depends on the sailing you book.
Commercial invoice, packing list, bill of lading, certificate of origin and the customs declaration your broker requires. The full set is prepared in Xuzhou before the container is sealed.
30% by T/T within five days of the contract, 70% before shipment. Or 30% in advance with a letter of credit for the balance.
Engine 6 months, hydraulic system 12 months, counted from commissioning. Wear parts and damage from use outside the manual are excluded.
15 to 20 working days after the deposit and the specification are confirmed, plus ocean transit to your port.
One machine in one 40 foot high-cube container. Cab, hopper and discharge chute removed and secured inside, drum wrapped and loaded last, chassis blocked on timber and cross-lashed.
Assembly drawings and a written commissioning procedure ship with the machine. Spare parts are standard catalogue items and can be air-freighted.
Rades for Tunis, plus Sfax, Sousse and Bizerte. All handle 40 foot high-cube containers on regular services.
The 2.6 m³ LM-S2600, at 80 to 100 m³ over a ten-hour day. On renovation work where the pour is 10 to 20 m³, it is the model that reaches the site; the larger units only pay when the road and the daily volume are both open.
Six months on the engine and twelve months on the hydraulic system, counted from commissioning. Wear parts and damage caused by operation outside the manual are excluded.
Thirty per cent by T/T within five days of the contract, seventy per cent before shipment. Alternatively thirty per cent in advance with a letter of credit for the balance.
Send us the plot width and the daily volume. We will tell you which model fits and quote it delivered to Rades, Sfax, Sousse or Bizerte.
Three quick fields — our sales team replies within 24 hours.